PSEG-LI is shutting down electrical power to the library on the morning on Tuesday, Aug. 26.
The old poles will be removed from Northern Blvd requiring the power for the immediate area to be shut down.
The library will be closed during the outage and anticipates re-opening from 1 – 9 p.m. after the PSEG work is complete.